Marathon’s gold corridor continues to deliver with 2.92 g/t Au over 71 meters, 1.88 g/t Au over 136 meters & 2.35 g/t Au over 29 meters, Valentine Lake Gold Camp

T.MOZ, Marathon Gold, gold

Marathon Gold Corporation (T.MOZ) is pleased to announce continued success in drilling wide intervals of excellent grade gold at the Marathon Deposit, Valentine Lake Gold Camp. Best intercepts included 2.92 g/t Au over 71 meters and 1.88 g/t Au over 136 meters in MA-17-165, and 2.32 g/t Au over 19 meters in MA-17-166 and 2.35 g/t Au over 29.0 meters in MA-17-167. These latest drill holes were designed to penetrate down-through the gold-bearing en-echelon stacked quartz-tourmaline-pyrite (QTP) vein swarms and confirm the vertical continuity of the strong gold mineralization within this 50 to 100-meter wide structural corridor which is open both along strike and to depth. Drilling also targeted QTP veining within the hanging wall of the deposit.read more

Leave a Reply

Your email address will not be published. Required fields are marked *