Metanor discovers a sub-vertical shear zone east of the Barry pit near surface and confirms the extension of the west zone in the Barry pit

metanor, gold, quebec

Metanor Resources Inc., (TSX VENTURE:V.MTO) pleased to provide an update on its ongoing surface drilling program at the Barry project in the Urban-Barry camp. Sixteen holes have been drilled so far this year, totalling 2,730 meters, towards the south-east and south-west of the Barry pit.

Highlights:
The drill holes MB-17-42 and MB-17-43 identified the mineralized sub-vertical shear structure.
The holes MB-17-29 to MB-17-38 drilled south-east of the pit allowed for the increase in size of the mineral envelope to the west associated to the pit.

Many narrow shear structures with gold mineralization, were encountered by the two drill holes MB-17-42 and MB-17-43.The discovery of higher grade mineralization (3.1 to 13.6 g/t over thickness near 2 meters) associated with the shear structures, provides the opportunity to define and extend narrow panels which may lead to a more selective mining method.

read more

Leave a Reply

Your email address will not be published. Required fields are marked *