Latest Marathon Deposit Drilling Hits 4.18 g/t Au over 43 meters, 2.12 g/t Au over 125 meters and 1.91 g/t Au over 82 meters, Valentine Lake Gold Camp

T.MOZ, Marathon Gold, gold

Marathon Gold Corporation (T.MOZ) is pleased to announce continued drilling success at the Valentine Lake Gold Camp with the intersection of wide intervals of excellent grade gold including 2.12 g/t Au over 125 meters and 4.08 g/t Au over 43 meters in MA-17-162, and 1.91 g/t Au over 82 meters and 3.20 g/t Au over 22 meters in MA-17-163. The results from MA-17-162 are included in the latest property wide gold resource totaling 1,388,200 oz. Au at 1.91 g/t (Measured & Indicated) and 766,150 oz. Au at 2.24 g/t (Inferred), (press release dated February 21, 2017). The results of MA-17-163, MA-17-164 and ongoing drilling will be included in further resource update expected to be completed later in 2017.read more

Leave a Reply

Your email address will not be published. Required fields are marked *